It does not guarantee it. The Public Water Service Regulation (Agreement COM-56-2023 of the Guatemala City Municipal Council, published in the Diario de Centro América on 21 Dec 2023) states in art. 1 that the service is provided 'according to EMPAGUA's availability, as a function of infrastructure and the availability of the water resource', with metered or unmetered service and categories set by the classification of the property (art. 1 verified on 2026-08-22). Piped water is cheap in regional terms (Q4-14/m³, roughly US$0.5-1.8/m³), but EMPAGUA does not assure feasibility for large new demands; that is why every large plant is designed around its own well plus storage.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Figures
- Costo del agua por red, rango observado
- Q4-14/m³ (≈US$0.5-1.8/m³)
Sources
Related records
- Absence of a general water law and national extraction fee
- Right to drill a well and ownership of the water (Civil Code)
- Industrial self-supply and the 2,000 wells of Guatemala's valley
- Procedure to drill an industrial well in the metropolitan area
- Cost and regulation of the municipal well-drilling license
- MARN environmental license costs and categories
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.