Viability of water-intensive industry in the dry corridor
- Water for industry
- Industrial water, wells and discharges
- Audited
It is the worst area for water-intensive industry. In the eastern dry corridor (Chiquimula, Zacapa, El Progreso, Jutiapa) rainfall runs 400-500 mm a year in parts of Jocotán and Camotán, with recurrent droughts; Wikipedia records annual values 'below 500 mm' in the semi-arid areas of Zacapa, Chiquimula and El Progreso. The government is drawing up in 2026 a contingency plan against climate threats for the dry corridor (Infobae, 19 May 2026). The potential conflict is with domestic water use. The CNB source proved inaccessible during the audit.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Figures
- Precipitación en Jocotán y Camotán
- 400-500 mm/año
- Precipitación en zonas semiáridas de Zacapa, Chiquimula y El Progreso
- <500 mm/año
Caveat
Sources
Related records
- Absence of a general water law and national extraction fee
- Right to drill a well and ownership of the water (Civil Code)
- Industrial self-supply and the 2,000 wells of Guatemala's valley
- Procedure to drill an industrial well in the metropolitan area
- Cost and regulation of the municipal well-drilling license
- MARN environmental license costs and categories
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.