Skip to content
Sunday, August 30, 2026 · Guatemala CityQ7.6242 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchResearched · unverified

The investor atlas

Viability of water-intensive industry in the dry corridor

Dossier
Water for industry14-agua-industrial.md
Domain
Industrial water, wells and dischargesagua
Room
Energy/energia
Audited
Audited

It is the worst area for water-intensive industry. In the eastern dry corridor (Chiquimula, Zacapa, El Progreso, Jutiapa) rainfall runs 400-500 mm a year in parts of Jocotán and Camotán, with recurrent droughts; Wikipedia records annual values 'below 500 mm' in the semi-arid areas of Zacapa, Chiquimula and El Progreso. The government is drawing up in 2026 a contingency plan against climate threats for the dry corridor (Infobae, 19 May 2026). The potential conflict is with domestic water use. The CNB source proved inaccessible during the audit.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Precipitación en Jocotán y CamotánCNB
400-500 mm/añoreferencia CNB
Precipitación en zonas semiáridas de Zacapa, Chiquimula y El ProgresoWikipedia, Hidrografía de Guatemala
<500 mm/añosíntesis Wikipedia

Caveat

CNB inaccessible during the audit; rainfall to be verified against INSIVUMEH

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.