Skip to content
Sunday, August 30, 2026 · Guatemala CityQ7.6242 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchResearched · unverified

The investor atlas

Open gaps and proposed indicators in the factory manual

Dossier
Manual: opening a garment factory13-manual-fabrica.md
Domain
What remains unverifiedbrechas
Room
Invest · Opening a garment factory/invertir/manufactura-confeccion
Audited
not audited

Main outstanding items: MINECO's official list of 29-89 requirements (the portal did not resolve; it includes the minimum export % and the procedure fee) and the unit's current name; the MARN schedule category for apparel and the typical cost and time of the environmental instrument; the 2020–2026 status of Sae-A's polyester complex and its amount (US$400 M vs ~US$200 M); the geo-referenced register of plants by municipality (VESTEX); EEGSA's BTDp/MTDp tariff schedule and the statutory connection deadline; well and water-license costs in Villa Nueva, Chimaltenango and Palín; lease or sale prices for industrial buildings at Michatoya, Tecnopark, Zeta and Multinova (all private); the text of Governmental Accord 256-2025 in the official gazette (Diario de Centro América); whether Bono 14 and the aguinaldo are subject to IGSS contributions; the vintage of the 79.69% yarn-forward figure and Guatemala's position among US suppliers (OTEXA); the 2022 MINECO PDF of 29-89 companies; the ocean lead time Puerto Quetzal→United States; the extension route for temporary admission; the Koramsa data from Clothesource; and Grupo Karim's in Guatemala. Proposed indicators: minimum_wage_maquila_ce1_2026/ce2_2026 (MINTRAB, annual), maquila_operator_cost_loaded_gtq (own calculation, annual), apparel_exports_usd (Banguat, monthly), apparel_yarn_forward_share_pct (OTEXA/USITC, annual), legal_2989_qualified_firms (MINECO, annual), apparel_employment_igss (IGSS, annual), mineco_2989_resolution_days (to be requested), zdeep_apparel_jobs (ZOLIC/press, event-driven) and us_apparel_imports_gtm_usd (OTEXA, monthly).

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Caveat

A list of gaps; no new figures

Sources

Organizations named in the answer

  • Tecnopark256 ha with 100 completed Class A warehouses, 35 min from Puerto Quetzal and 1 h from the border with El Salvador.Industrial park
  • Puerto QuetzalThe southern corridor's sea outlet: the Pacific coast handles 60% of the country's port traffic; around 60 km from the capital by the Palín-Escuintla motorway and 4 km from Zona Libre QuetzalPort
  • KoramsaPrecedent: 250,000 jeans a week with 9,000 workers in early 2008; it announced around 4,000 redundancies in November 2008 because of the crisis ('Guatemala's leading maquila'); its key assets were bought by PCCA and relaunched as Denimatrix (February 2009)Company case

Directory of organizations

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.