Synergy Industrial Park: developer and offering

Dossier
Industrial and logistics real-estate development21-naves-desarrollo.md
Domain
Industrial warehousing: stock and rentsnaves-desarrollo
Room
Invest · Industrial warehousing: stock and rents/invertir/naves-desarrollo
Audited
Audited

Synergy Industrial Park is developed by Spectrum (Grupo Pantaleón, 27+ years in real estate development) at km 53 of the Pacific motorway, Escuintla (Prensa Libre places it at km 55.5 — a discrepancy still to be verified). Groundbreaking was in December 2022; 500 ha are set aside for the park (715 lots according to Prensa Libre) within a 4,700-ha master plan designed by EDSA; initial investment US$20+ M; a first building of 10,180 m² completed in March 2024. Tenants as of July 2025: Plastimax, Colombina, Ferco, Hogartex, Grupo Pantaleón, Cervecería Centroamericana, Mabe (15,000 m²) and Supertex (the initial ones in April 2024: Novaforest, Plastimax, Ferco, Colombina). What is on offer: land for sale, warehouses to rent, build-to-suit, a ZDEEP cluster, a non-ZDEEP cluster and a 29-89 cluster; LEED Master Site Registered; fiber optics and diesel on site. Contact: industrialpark@synergy.com.gt, (502) 2208-1111.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Superficie del parque / plan maestroPrensa Libre / Synergy
500 ha / 4,700 ha2024
Primer edificioPrensa Libre 8-abr-2024
10,180 m², concluido mar-20242024
Inversión inicialPrensa Libre
US$20+ M2022-2024

Caveat

exact km marker (53 vs 55.5) still to be verified

Sources

Organizations named in the answer

  • Synergy Industrial ParkMultitenant Class A warehouses for rent, land for sale and build-to-suit, with a 69 kV substation (up to 60 MW); it offers the ZDEEP or 29-89 regimes or none; developed by Spectrum and Grupo Pantaleon.Industrial park
  • SpectrumThe property arm developing Synergy Industrial Park.Company case
  • PantaleónBID Invest precedent: US$70 M in 2021 (US$50 M from the BID Group + US$20 M mobilized) for green agro-industrial investment and working capital for cane growers (§8).Company case
  • Prensa LibreConfirms the 10% capital gains tax (art. 92, Decree 10-2012), the taxable base, the 10-day deadline and SAT form 1321Other
  • EDSADesigned the 4,700 ha master plan of Synergy Industrial ParkSupplier
  • PlastimaxA tenant of Synergy Industrial Park (Apr-2024 and Jul-2025)Company case

and 6 more · Directory of organizations

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.