SNI installed capacity and wholesale market unit charges

Dossier
Energy, water and telecommunications05-energia-agua.md
Domain
The power market and its tariffsenergia
Room
Energy/energia
Audited
not audited

The official installed capacity of the national grid by technology (2025) is in MEM's Indicative Generation System Expansion Plan 2026-2050 (PEIG), but mem.gob.gt blocked the automated download and the figure was not confirmed in a primary source; the press (Republica GT) mentions an 'effective capacity close to 3,400 MW'. The 2025 wholesale market unit costs — main and secondary tolls, RRO and capacity deviations in US$/kW-month — appear on p. 7 of the AMM 2025 Statistical Report, but text extraction scrambled the label-to-value match and the atlas does not cite them until the PDF is re-read. Both are declared gaps, pending the data phase.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Capacidad efectiva (prensa)prensa — sin confirmar en PEIG del MEM
~3,400 MW2025-2026, según República GT
Cargos unitarios del mercado mayorista (peajes, RRO, DP en US$/kW-mes)AMM, Informe Estadístico 2025 Anual, pág. 7
pendientes de relectura del PDF2025

Caveat

3,400 MW: press figure unconfirmed in a primary source; unit charges pending a re-reading of the AMM report

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.