Self-generation and installed distributed renewable generation (GDR)
- Energy, water and telecommunications
- The power market and its tariffs
- not audited
The Distributed Renewable Generator (GDR) category covers plants under 5 MW; as of 1 April 2025 there were 64 GDRs registered with the AMM. According to Energia Estrategica, Guatemala has passed 200 MW installed between self-producers and GDRs; that is a press figure, still to be checked against the CNEE's GDR and UAEE Statistical Report 2020-2024. This dossier does not set out the procedural requirements for connecting self-generation.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Figures
- Umbral GDR
- <5 MW
- GDR habilitados
- 64
- Instalado entre autoproductores y GDR (prensa)
- >200 MW
Caveat
Sources
Related records
- Wholesale market participants, from generators to large users
- 2025 electricity generation mix and renewable share
- 2025 SNI production, consumption and average spot price
- Regulated EEGSA, DEOCSA and DEORSA tariffs and the social tariff
- Gran Usuario status and buying power outside the regulated tariff
- PEG-5 bids, MW submitted and process timeline
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.