Skip to content
Sunday, August 30, 2026 · Guatemala CityQ7.6242 per US$+0.00%
ADVANCE GUATEMALA
Back to the researchResearched · unverified

The investor atlas

PEG-4-2022 tender awards and prices

Dossier
Energy, water and telecommunications05-energia-agua.md
Domain
The power market and its tariffsenergia
Room
Energy/energia
Audited
not audited

PEG-4-2022, awarded in August 2023, contracted ~399.27 MW for the guaranteed capacity block, entering operation between 2026 and 2028 under 15-year contracts. Prices came in below US$90/MWh on a monomic basis, with a record US$20.32/MWh in the energy-only bid. The project detail is in Resolution CNEE-196-2023, cited by the AMM.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Potencia garantizada contratada PEG-4MEM/FUNDESA, pág. 16
~399.27 MWadjudicada ago-2023; entrada 2026–2028
Plazo de contratosMEM/FUNDESA, pág. 16
15 añosPEG-4-2022
Precio monómicoMEM/FUNDESA, pág. 16
< US$90/MWhPEG-4-2022
Precio récord solo energíaMEM/FUNDESA, pág. 16
US$20.32/MWhPEG-4-2022

Sources

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.