Shifts, working hours and 24/7 operation under the Labor Code
- Manual: opening a garment factory
- Social security, work permits and shifts
- not audited
The Labor Code sets the day shift at a maximum of 8 hours a day and 48 a week; the night shift at 6 hours and 36 a week; the mixed shift at 7 hours and 42 a week; overtime carries a 50% premium. The implication for plant design — an editorial inference by the dossier, not a citable figure — is that a 24/7 operation requires four crews or a structural overtime bill. The primary sources are in dossier 04 §10.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Figures
- Jornada diurna máxima
- 8 h/día, 48 h/semana
- Jornada nocturna / mixta
- 6 h/36 h · 7 h/42 h
- Recargo hora extra
- +50%
Caveat
Sources
- Código de Trabajo de Guatemala (Decreto 1441), jornadas — fuentes primarias citadas en el dossier 04 §10; este dossier no reproduce la URL
Related records
- Employer and employee IGSS contributions and total labor cost load
- Cost and timeline of the work permit at MINTRAB
- Who pays for the work permit and its legal basis
- Guatemalan-staff quota and limits on foreign employees
- Wage savings from locating outside the department of Guatemala
- IGSS employer registration: threshold and deadline
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.