Build-to-suit supply and its precedents in Guatemala
- Industrial and logistics real-estate development
- Industrial warehousing: stock and rents
- Audited
Yes. Precedents: Hansae and ShinWon at Michatoya Pacífico (2025, US$25 M and US$12.5 M); Grupo Salinas at Synergy (groundbreaking 15-Nov-2025); institutionalised BTS supply at Synergy (rent + BTS + tax clusters), Interoceánica ('we build according to the client's requirements'), the 28,800 m² building in Escuintla with a BTS option and Michatoya (land or a completed building); and the in-house DCs of PepsiCo and Nestlé (2020). The 2024-2026 shift runs from selling condominium office-warehouses towards speculative Class A rental (Multinova 2 with no pre-leasing) and park-based BTS — the pattern that usually precedes the arrival of institutional developers. Latam Logistic Properties stated in July 2019 that it was 'looking at' Guatemala; seven years later there is no project, so it is not a live signal.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Sources
- Prensa Libre, 27-jun-2025, Hansae y ShinWon invertirán US$37 millones en Michatoya Pacífico
- Metroredes, 15-nov-2025, Grupo Salinas
- Synergy Industrial Park, sitio del desarrollador (promocional)
- GPI/CityMax, listado nave industrial en alquiler 28,800 m² Escuintla (cód. PAOB-001-10-25-12)
- La República (CR), 30-jul-2019, Latam Logistic Properties
Organizations named in the answer
Related records
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.