Data centers and industrial connectivity costs
- Energy, water and telecommunications
- Telecoms, fiber and data centers
- not audited
Data Center Map lists 7 facilities in the Guatemala City area. Tigo DC Fraijanes (Tigo Business) offers colocation and cloud and presents itself as built 'to Tier III standards'; that is a promotional claim and the specific Uptime certification is still to be verified. Claro Empresas advertises a data center with ICREA 'Level IV' certification (99.99% availability), likewise an operator claim pending verification. The costs of dedicated fiber, IP transit and colocation are not public: they are quoted directly with Tigo Business and Claro Empresas, and the atlas records them as private data, without estimating them.
The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.
Figures
- Data centers listados en área de Ciudad de Guatemala
- 7
- Tigo DC Fraijanes
- colocation y nube; «estándares Tier III» (promocional)
- Claro Empresas data center
- ICREA «Nivel IV», 99.99% (promocional)
- Precios de fibra dedicada, tránsito IP y colocation
- no públicos — cotización directa
Caveat
Sources
Related records
This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.