Cost per square meter of building an industrial warehouse

Dossier
Free zones, ZDEEP and industrial parks07-zonas-parques.md
Domain
What building costscostos-construccion
Room
Invest · Industrial warehousing: stock and rents/invertir/naves-desarrollo
Audited
not audited

There are only tier c references (blogs and suppliers), all pending verification. A roofing sheet supplier (Lámina KR18) estimates for 2025: prefabricated steel structure US$80–150/m², reinforced concrete US$200–350/m² and hybrid US$130–250/m². A sector blog (Living in Guatemala) puts the general construction range at Q3,000–5,500/m², with industrial projects up to ~Q9,000/m². Espacio Chapín attributes to the Guatemalan Construction Chamber (CGC) a cost structure per m² of ~45% materials, 35% labor and 20% overhead and profit, to be checked against a CGC publication. The CGC, founded in 1971, publishes periodic reports on material and labor costs, but its site exposes no downloadable public series; it has to be requested. The only official reference is INE's IPMC.

The research is written in English; quoted figures, source names and the titles of legal instruments stay in the language their source published them in.

Figures

Bodega con estructura metálica prefabricadaLámina KR18 (proveedor, tier c)
US$80–150/m²2025
Bodega de concreto reforzadoLámina KR18 (proveedor, tier c)
US$200–350/m²2025
Bodega híbridaLámina KR18 (proveedor, tier c)
US$130–250/m²2025
Rango general de construcciónLiving in Guatemala (blog, tier c)
Q3,000–5,500/m² (industrial hasta ~Q9,000/m²)consultado 2026-08-19
Estructura de costo por m² atribuida a CGCEspacio Chapín (blog citando CGC, tier c)
~45% materiales / 35% mano de obra / 20% administración y utilidad2025

Caveat

tier c: promotional claims and blogs, to be verified; the CGC series is not public

Sources

Organizations named in the answer

  • Living in GuatemalaCommercial buying guide for foreigners: the steps (NIT, RGP certification, promise-to-sell with a 5–10% deposit, deed, registration in 2–4 weeks, notices), typical closing of 4–8 weeks, lawyer at Q3,000–Q8,000 or 0.5–1%, total costs of ~4.5–6.5% (resale) and ~13.5–15% (new build), apostilled power of attorney for buying at a distance, and RGP certification with QROther
  • Cámara Guatemalteca de la Construcción (CGC)Publishes Construcción en Cifras (construction GDP of Q30,171.3 million, +8.3% in 2025; investment of Q61,053.7 million), the Construction Sector Confidence Index (ICSC, 68.7 points in Apr-2026), the monthly Listado de Precios de Materiales and the quarterly Boletín Económico de la ConstrucciónChamber or trade body

Directory of organizations

Related records

This layer is research: read from public sources by the archive's own team, every claim cited with the date it was consulted, and audited where it is marked so. It has not entered the verified store — no figure here was fetched back from its source or stamped with a retrieval time — so it wears no red provenance numeral and never mixes with the verified figures.